From complex pump stations to large-diameter trunk sewers, Prost Group has delivered critical infrastructure projects for Australia's leading contractors and water authorities.

60+

Kilometres of Pipeline

35+

Years Experience

50+

Full-Time Staff

90+

Machines Owned

Harlowe sewer pump station construction overviewLarge diameter storage tank installation at Harlowe pump station100-ton crane operations at Harlowe sewer pump stationAerial view of Harlowe pump station construction site
Pump Station Coliban Water

Harlowe Sewer Pump Station & Rising Main

Client: Winslow Constructors & Coliban Water

A landmark pump station project featuring a large-diameter wet well up to 7 metres deep and a 25-metre, 3-metre diameter storage tank. This project required 100-tonne crane operations and demonstrated Prost Group's capability in delivering complex pump station assets for water authority handover.

7m Deep Wet Well 100T Crane Lift 25m Storage Tank
Deep Excavation Greater Western Water

Underbank Branch Sewer

Client: Greater Western Water & YVE Group

Deep trenching in Bacchus Marsh with trench depths reaching 8.5 metres in extreme groundwater conditions. This project required purpose-built shoring systems and advanced dewatering to maintain safe, stable excavations in one of the most challenging ground environments in Victoria.

8.5m Trench Depth Extreme Groundwater Engineered Shoring
Deep trenching for Underbank branch sewer in Bacchus MarshDeep excavation with engineered shoring systemsGroundwater management during deep trench excavationDeep excavation operations for sewer pipeline
MACA Infrastructure project - Bridge Road Extension branch sewerLarge diameter pipeline construction for MACA InfrastructureLarge diameter manhole construction for trunk drainageJet truck and heavy plant on MACA Infrastructure project
Trunk Drainage MACA Infrastructure

Bridge Road Extension — DN1500 Main Drain

Client: MACA Infrastructure

A major trunk drainage project featuring DN1500mm stormwater pipeline installation at depths up to 5.5 metres. This project showcased Prost Group's capability in large-diameter drainage construction with purpose-built shoring systems and heavy plant operations.

DN1500mm 5.5m Deep Heavy Plant
Rock Boring Greater Western Water

Taylors Run Branch Sewer

Client: Greater Western Water

A complex sewer construction project requiring rock bores under major fuel and gas lines, combined with open trenching up to 5 metres deep. This project demonstrated Prost Group's ability to safely navigate critical utility crossings in challenging rock formations while maintaining program delivery.

Rock Boring 5m Deep Utility Crossings
Rock boring and deep trenching for Taylors Run branch sewer
Live works for Merylnstone sub-station sewer and water outfall
Design & Construct John Holland

Merylnstone Sub-Station

Client: John Holland & Metro Trains

Design and construction of sewer and water outfall services for a critical rail infrastructure upgrade. This project required close coordination with rail operations, live service connections, and complex urban construction in a densely populated area.

Design & Construct Rail Interface Urban Works
Land Development BMD Urban

Mandalay Estate Stages

Client: BMD Urban

A multi-stage residential development delivering sewer reticulation, stormwater drainage construction, and ongoing maintenance over a 2.5-year program. This long-term engagement demonstrated Prost Group's reliability as a trusted delivery partner for large-scale land development projects.

2.5 Year Program Multi-Stage Sewer & Drainage
Land development infrastructure construction at Mandalay EstateResidential subdivision pipeline installationLand development project constructionWater main reticulation for residential development
Sunbury outfall trunk sewer large diameter manhole constructionLarge diameter in-situ manhole constructionSewer pipeline construction for trunk sewer projectManhole adjustments and construction works
Trunk Sewer BMD Constructions

Sunbury Outfall Trunk Sewer

Client: BMD Constructions

Large-diameter in-situ manhole construction featuring 2700mm manholes and DN1100 HOBAS pipe installation. This project required precision construction of critical trunk sewer infrastructure for one of Melbourne's fastest-growing corridors.

2700mm Manholes DN1100 HOBAS In-Situ Construction
Our Clients

Trusted by Industry Leaders

John Holland
MACA Infrastructure
BMD Constructions
SRG Global
NEXTDC
Unyte
DPJ Civil
BILD Group
Winslow Group
YVE GROUP

Ready to Start Your Project?

From concept to completion, Prost Group delivers critical infrastructure with precision and reliability. Get in touch to discuss your next project.